Preliminary energy assessment

A first step towards identifying where your facility can improve its energy efficiency, before undertaking an in-depth study.

3S diagram: available data, initial assessment and improvement guidance
01
Preliminary assessmentInitial appraisal of improvement potential
02
Existing dataUsually without an on-site measurement campaign
03
Next stepsPriorities for more detailed study

01 / FIRST ASSESSMENT

Find out where further analysis will add value.

A preliminary energy assessment provides an initial evaluation of energy performance in an industrial facility, building or installation. It identifies potential inefficiencies and helps set priorities using available information on consumption, technology, usage and energy contracts.

The right scope for the decision.

This is neither an energy audit nor a detailed assessment: opportunities are evaluated provisionally, without presenting savings or investments as fully verified results. Work is generally carried out without site visits or dedicated field measurements; these can be agreed separately if required.

02 / AREAS OF ANALYSIS

An initial picture of energy use.

We examine the main factors affecting costs and efficiency, tailoring our analysis to the customer’s activities and facilities.

SUPPLIES

Electricity

Historical consumption, 15-minute load profiles and demand patterns.

SUPPLIES

Gas and other utilities

Available flow rates, invoices, prices and supply conditions.

FACILITIES

Equipment and technologies

Equipment inventory, major energy users, installed capacity and estimated operating hours.

ACTIVITY

Processes and utilisation

Production activity, shifts, utilisation rates and seasonality.

BUILDINGS

Lighting and HVAC

Lighting and HVAC technologies and building management systems, where applicable.

CONTRACTS

Tariffs and capacity

Review of tariff periods, contracted capacity and potential adjustments.

03 / INFORMATION NEEDED

What information do we need?

The quality of a preliminary assessment depends on the available documentation. These are the main sources we request for an initial review:

  • Description of the business and facilities.
  • Inventory of major equipment.
  • Approximate operating hours and shifts.
  • Historical energy invoices and consumption.
  • 15-minute electricity load profiles, if available.
  • Tariffs, flow rates and contracted capacity.
  • Lighting, HVAC and BMS data, where relevant.
  • Production or operational activity data, where applicable.
Not every item is required at the outset.

3S will review the documentation and help identify the most relevant variables. Any gaps will be noted in the findings and, where appropriate, further measurements or analysis will be recommended.

04 / METHODOLOGY

Four steps. Sound technical judgement.

We turn information from different sources into a useful first assessment to guide subsequent action.

Preliminary energy assessment: gather data, analyse it, identify opportunities and recommend next steps
Illustrative workflow. Each assignment is tailored to the characteristics of the facility.

05 / FINDINGS

A report to support informed decisions.

What the customer receives

A preliminary energy assessment report setting out the initial findings and recommendations proportionate to the information assessed.

  • Main improvement opportunities identified.
  • Recommended good practices and operational adjustments.
  • Preliminary assessment of tariffs and optimum contracted capacity.
  • Indicative estimates based on experience and comparable references.
  • Equipment or processes that merit more detailed assessment.

06 / CHOOSING THE RIGHT LEVEL OF STUDY

Preliminary assessment, detailed assessment or audit?

These studies differ in scope and depth. A preliminary assessment helps determine whether a more detailed phase is worthwhile.

FIRST STEPPreliminary assessment

Initial desk-based review. Indicative opportunities and recommendations, usually without field measurements.

TARGETED ANALYSISDetailed assessment

Technical study of priority equipment or consumption, with field measurements as agreed.

COMPREHENSIVE REVIEWEnergy audit

Full facility assessment, with greater technical and financial detail.